honoluluadvertiser.com

Sponsored by:

Comment, blog & share photos

Log in | Become a member
The Honolulu Advertiser
Posted on: Tuesday, October 30, 2001

Roadwork

Advertiser Staff

Through Friday

(8:30 a.m. to 3:30 p.m., unless noted)

CENTRAL HONOLULU

1. H-1 Freeway, Punahou and Pi'ikoi on-ramps, kokohead-bound, intermittent lane closures, 8:30 a.m. to 2:30 p.m., through Friday.

2. H-1 Freeway resurfacing: 'ewa-bound, Kapi'olani interchange to Punchbowl on-ramp, 9 p.m. to 5 a.m., through Friday; and both directions, University Avenue to Kapi'olani interchanges, 9 a.m. to 3 p.m., through Friday.

3. King Street: Austin to Desha lanes; Liliha to River streets, and Bethel to South streets, 8:30 a.m. to 3:30 p.m., and about 7:30 p.m. to 4:30 a.m. (noisy work daytime; asphalt resurfacing, nighttime). Affected bus stops moved temporarily to nearby sites as needed. Also: GASPRO work on North King Street, near Liliha Street. Some Punchbowl Street work continuing through end of October. Project hotline: 479-7952.


EAST HONOLULU

4. Kalaniana'ole Highway: contraflow, kokohead-bound, Wa'a Street to Wailupe Circle, and single-lane closure (either direction), 'Aina Koa to Laukahi Street, 9 a.m. to 3 p.m.


CENTRAL O'AHU

5. Wahiawa: Kamehameha Highway at Leilehua Golf Course Road.; and Wilikina Drive and Kamananui Road.

6. H-1 Freeway: Palehua Separation to Waikele Bridge, eastbound, 9:30 a.m. to 3:30 p.m.

7. Mililani: Meheula Parkway, Kamehameha Highway to Lanikuhana; and Kuahelani Avenue, Meheula Parkway to Kamehameha Highway.


WINDWARD O'AHU

8. Kane'ohe:

• Kahekili Highway: water-main and fire-hydrant installation, 'Ahuimanu to Ha'iku roads, and Kulukeoe Street to Likelike Highway. Also: Changeable message sign installation, Likelike Highway to Kulukeoe Street, townbound, 9 a.m. to 3:30 p.m.; outbound, 8:30 a.m. to 3 p.m.

• H-3 Freeway work: camera repair, townbound ramp, vicinity of Kahuapa'ani Street, 9 a.m. to 3:30 p.m.

• Kamehameha Highway: resurfacing, both directions, Kane'ohe Bay Drive to Kahiko Street, including Kamehameha/Kane'ohe Bay Drive intersection, 9 a.m. to 3 p.m.

• Likelike Highway: Kahekili to Kamehameha highways.

9. Kailua: Kainui Drive, sewer work, Oneawa Street to Kalaheo Avenue.


NORTH SHORE

10. Hale'iwa: water line installation, Hale'iwa Road and surrounding streets.

11. Sunset Beach: water main installation, Kamehameha Highway, Paumalu Place to Kahae Road.


LEEWARD O'AHU

12. Farrington Highway: highway lighting, Hakimo to Piliokoe Bridge, outbound.

13. Fort Weaver Road: resurfacing, north of Laualunui to Hanakahi streets, 9 a.m. to 4 p.m., northbound; and 8 a.m. to 3 p.m., southbound.