Roadwork
Advertiser Staff
Through Friday
H-1 Freeway work: 8:30 a.m. to 3:30 p.m., unless noted.
CENTRAL HONOLULU
1. H-1 Freeway: Punahou off-ramp: intermittent lane closures, 8:30 a.m. to 2:30 p.m.
2. H-1 Freeway: Vicinity of Punchbowl off-ramp to Kapi'olani Interchange: 'ewa-bound, 9 a.m. to 5 a.m.; and both directions, University Avenue to Kapi'olani interchange, 9 a.m. to 3 p.m.
3. King Street: Austin to Desha lanes; Liliha to River streets, and Bethel to South streets, 8:30 a.m. to 3:30 p.m., and about 7:30 p.m. to 4:30 a.m. (noisy work daytime; asphalt resurfacing, nighttime). Affected bus stops moved temporarily to nearby sites as needed. Also: GASPRO work on North King Street, near Liliha Street. Project hot line: 479-7952.
EAST HONOLULU
4. Kalaniana'ole Highway: contra flow, kokohead-bound, 'Anali'i Street to past Wa'a Street, and single-lane closure (either direction), 'Aina Koa to Laukahi Street, 8:30 a.m. to 3 p.m.
CENTRAL O'AHU
5. Wahiawa: Kamehameha Highway at Leilehua Golf Course Road.; and Wilikina Drive and Kamananui Road.
6. H-2 Freeway: Palehua Separation to Waikele Bridge, eastbound, 8:30 a.m. to 3:30 p.m.; and westbound, 7:30 a.m. to 3:30 p.m.
7. Mililani: Mehe'ula Parkway, Kamehameha Highway to Lanikuhana; and Kuahelani Avenue, Mehe'ula Parkway to Kamehameha Highway.
WINDWARD O'AHU
8. Kane'ohe:
Kahekili Highway: water-main and fire-hydrant installation, 'Ahuimanu to Ha'iku roads, and Kulukeoe Street to Likelike Highway. Also: message sign installation, Likelike Highway to Kulukeoe Street, townbound, 9 to 3:30 p.m.; outbound, 8:30 a.m. to 3 p.m.
H-3 Freeway: Changeable message sign repair, Mokapu Saddle Road and Halekou interchange, 9 a.m. to 3:30 p.m.
Kamehameha Highway: resurfacing, northbound right lane, Kane'ohe Bay Drive to Kahiko Street, 9 a.m. to 3 p.m.
Likelike Highway: Kahekili to Kamehameha highways; townbound, 'Ano'i Road to Kahekili Highway, 9 a.m. to 3:30 p.m.
9. Maunawili: Auloa Road, Castle Junction to near Luna'ai Street.
10. Kailua:
Kailua Road, near and at intersection with Kalaheo Avenue; and Kalaheo Avenue, between Kaikea Place and White Sands Place, sewer line rehabilitation.
Kaha Street and Loop, Kaimake Loop and Kaipiha Street, water main work.
Kainui Drive, Oneawa Street to Kalaheo Avenue, sewer work.
Keolu (Drive) Hamakua (Drive) Traffic Safety Project, construction of raised median, sidewalks and curb ramps.
NORTH SHORE
11. Hale'iwa: water line installation, Hale'iwa Road and surrounding streets.
LEEWARD O'AHU
12. Kunia: H-1 Freeway, Kunia interchange to Waikele Stream Bridge, 8:30 a.m. to 3 p.m.
13. Farrington Highway:
Waomea Street intersection: work in townbound right lane.
Hakimo Road to Piliokoe Bridge: lighting improvements, outbound.
14. Fort Weaver Road: resurfacing, north of Laualunui to Hanakahi streets, 8:30 a.m. to 3:30 p.m., northbound; and 8 a.m. to 3 p.m., southbound.