honoluluadvertiser.com

Sponsored by:

Comment, blog & share photos

Log in | Become a member
The Honolulu Advertiser
Posted on: Tuesday, March 26, 2002

Roadwork

(8:30 a.m. to 3:30 p.m., unless noted)

CENTRAL HONOLULU

  • H-1 Freeway, Punahou off-ramp, and Pi'ikoi on-ramp, kokohead-bound, intermittent lane closures, 8:30 a.m. to 2:30 p.m.
  • H-1 Freeway resurfacing, ewa-bound, Kapi'olani interchange to Punchbowl on-ramp, 9 p.m. to 5 a.m., through Friday; and both directions, University Avenue to Kapi'olani Boulevard interchanges, 9 a.m. to 3 p.m., through Friday.
  • Downtown: Curb ramp construction, various locations.
  • King Street: Liliha to River streets, and Bethel to Richards streets (day and night work, Thursday through Sunday.)
  • Lusitana Street: Sewer line construction, Pauoa Road to 'Auwaiolimu (road closed 8:30 a.m. to 3:30 p.m. through Friday).
  • Kaimuki: Curb ramps and sidewalk widening along Wai'alae Avenue.
  • Nu'uanu: Reconstruction of Nu'uanu Avenue, Nu'uanu Pali Drive and Booth Road.
  • Manoa-McCully: Reconstruction of Manoa Road, O'ahu Avenue, Dole and McCully streets.
  • Ward Avenue & Kina'u Street: Curb and gutter reconstruction.
  • Kapi'olani Boulevard and King Street: Sidewalk reconstruction and tree trimming, Kapi'olani Boulevard, Kalakaua Avenue to McCully Street; and King Street, Alapa'i Street to University Avenue.
  • Makiki: Repaving, Mott-Smith Drive and Punahou Street.
  • Kapahulu: Reconstruction of Monsarrat and Mo'oheau avenues.

EAST HONOLULU

  • Kalaniana'ole Highway: Resurfacing work: contra-flow, kokohead-bound, Wailupe Circle to West Hind Drive; Waikui to 'Anali'i streets, 8:30 a.m. to 3 p.m.
  • Hawai'i Kai: Water main installation, Hawai'i Kai Drive, Pohoiki Place to Pepe'ekeo Street, and along various side streets; and Kawaihae Street, Kalaniana'ole Highway to May Way, and some surrounding streets.

CENTRAL O'AHU

  • 'Aiea: Improvements on 'Aiea Heights Drive.
  • Wahiawa: Intersections of Kamehameha Highway at Leilehua Golf Course Road.
  • Pearl City: Rehabilitation of Waimano Home Road, Komo Mai Drive to end.
  • Waipahu: Rehabilitation of Waipahu Street, Kunia Road to Mahoe Street.

WINDWARD O'AHU

  • Likelike Highway: Kahekili to Kamehameha highways.
  • Kahekili Highway: Water-main and fire-hydrant installation, 'Ahuimanu to Ha'iku roads, and Kulukeoe Street to Likelike Highway, 8:30 a.m. to 3:30 p.m.
  • Kamehameha Highway: Resurfacing, both directions, Kane'ohe Bay Drive to Kahiko Street, including Kamehameha/Kane'ohe Bay Drive intersection.

NORTH SHORE

  • Hale'iwa: Water line installation, Hale'iwa Road and surrounding streets.
  • Sunset Beach: Water main installation, Kamehameha Highway, Paumalu Place to Kahae Road.
  • Waialua: Kaukonahua Road, Kamehameha Highway to Wilikina Street, and Waialua Beach road, Kuoha to Au streets.

LEEWARD O'AHU

  • Wai'anae: Reconstruction and resurfacing, Lualualei Homestead Road, between Poka'i Bay and Hale 'Ekahi Drive; and Pa'akea Road, Hakimo to Ma'ili'ili Road, and Makaha Valley Road.
  • Farrington Highway: Lighting improvements, Hakimo Road to Piliokoe Bridge, outbound; and intersection improvements at Waomea Street, town-bound, right lane.