Posted at 1:53 a.m., Thursday, December 7, 2006
Farrington work in Nanakuli continues
Advertiser Staff
West-bound right lanes will be closed on Farrington Highway between Hakimo Road and Ka'ukama Road from 8:30 a.m. to 3 p.m. through tomorrow.The right lane will be closed for adjustments to an existing concrete channel wall and the installation of a chain-link fence.
Other road projects around O'ahu:
Farrington project in Waipahu continues
Lanes will be closed on Farrington Highway in Waipahu through tomorrow at these locations and times:
East-bound, 8:30 a.m. through 3 p.m. daily
West-bound, 7:30 a.m. through 3 p.m.
H-1 Freeway lane closed near Middle Street tunnel
Right and shoulder lanes will be closed on the H-1 Freeway in both directions near the Middle Street tunnel through tomorrow at the following hours, for guardrail and shoulder improvements:
Likelike Highway improvements continue
Lanes may be closed along Likelike Highway between Valley View Drive and the Wilson Tunnels through tomorrow for guardrail installation, shoulder paving and roadway striping.
Kunia Road lanes to close near Wheeler
Lanes will close in both directions on Kunia Road between Kunia Plantation Road and Lyman Road from 8:30 a.m. to 3 p.m. through tomorrow for roadside slope maintenance and erosion control work.
Kamehameha work ongoing in Kane'ohe
Lanes will close in both directions on Kamehameha Highway between Pali Highway and Kahiko Street from 8:30 a.m. to 3 p.m. through tomorrow for guardrail installation and lane striping.
During this time, the on-ramp loop to the H-3 Freeway (west) from the Kane'ohe-bound lanes of Kamehameha Highway at the Halekou Interchange may be closed for relocation of street lighting conduits.
As an alternate route, motorists may use the H-3 Freeway (west) on-ramp from the Kailua-bound lanes of Kamehameha Highway at the Halekou Interchange.
Pu'uloa Road project still under way
Selected lanes will be closed on Pu'uloa Road from Kamehameha Highway to Salt Lake Boulevard from 8:30 a.m. to 3 p.m. through tomorrow:
Kamehameha work near Crouching Lion
Lanes will close on Kamehameha Highway between Waiahole Valley Road and Crouching Lion Inn through tomorrow for pavement marking, sign installation and guardrail work. One lane in either direction will be closed and traffic will contra-flowed from 8:30 a.m. to 3 p.m. daily.
'Aiea Access Road resurfacing continues
Shoulder lanes will close in both directions on 'Aiea Access Road from Moanalua Road to Kamehameha Highway from 8:30 a.m. to 3 p.m. through tomorrow for road signs, guardrail and bike rail installation.
More work on Halawa Heights Road
Lanes will close on Halawa Heights Road between Ulune Street and Fernridge Place in the vicinity of Camp Smith from 8:30 a.m. to 3 p.m. through tomorrow for striping, lane marking and sign installation.
Kamehameha Highway lanes closed near Pearl Harbor
The right lane will close on Kamehameha Highway (out-bound) between Radford Drive and Halawa Drive from 8:30 a.m. to 3 p.m. through tomorrow for bikeway construction.