honoluluadvertiser.com

Sponsored by:

Comment, blog & share photos

Log in | Become a member
The Honolulu Advertiser

Posted at 7:09 a.m., Friday, June 2, 2006

'Aiea Access Road work will close lanes

Advertiser Staff

'Aiea Access Road construction continues

The right south-bound lane along 'Aiea Access Road from Moanalua Road to Kamehameha Highway will be closed today, 8:30 a.m. to 3 p.m., for barrier and electrical work.

Shoulder lanes may be closed along the southeast on-ramp (Honolulu-bound) from Kamehameha Highway to the Moanalua Freeway.

A right lane will be closed along the Moanalua Freeway (eastbound) between McGrew Point and the loop ramp today, 8:30 a.m. to 3 p.m., as part of the roadwork.

Roadwork scheduled near Camp Smith

  • Lanes may be closed along Halawa Heights Road near Camp Smith today, 8:30 a.m. to 3 p.m., for roadwork.

  • Lanes may be closed along Halawa Heights Road between Ulune Street and Fernridge Place near Camp Smith for median curb work and roadway widening.

  • The right makai-bound lane of the Kahuapa'ani Overpass will be closed today, 8:30 a.m. to 3 p.m., for bridge work.

    Closures set for H-1 Waimalu widening project

    The H-1 between the H-1/Moanalua Freeway merge and the Pearl City off-ramp will be closed at the following locations:

  • H-1, Pearl City off-ramp to the Halawa Interchange — the eastbound shoulder lane will be closed today, 10:30 a.m. to 11:59 p.m.

  • H-1 westbound — the H-1 Freeway in the westbound direction between the H-1/Moanalua Freeway merge and the Pearl City off-ramp will be completely closed today and tomorrow, 9:30 p.m. to 8:30 a.m.

    Message boards will be used to inform motorists of the full freeway closure. 

    Lane closures slated for Fort Weaver Road

    Lanes may be closed along Fort Weaver Road/Kunia Road between 'Ewa Beach town and Royal Kunia tonight, 9 p.m. to 4 a.m., for pavement striping.

    Pavement repairs along Pali Highway

    Weather permitting, single lanes will be closed along Pali Highway Honolulu-bound between the Pali Tunnels and Old Pali Road today, 8:30 a.m. to 3 p.m., for pavement repairs.

    Construction project continues along Kalaniana'ole Highway

    Lanes will be closed Honolulu-bound along Kalaniana'ole Highway at the right-turn lane onto Kamehameha Highway today, 8:30 a.m. to 3 p.m., for guardrail work.

    Pu'uloa Road improvements continue

  • Both shoulder lanes along Pu'uloa Road from Kamehameha Highway to Salt Lake Boulevard will be closed today, 8:30 a.m. to 3 p.m., for utility work.

  • Lanes may also be closed along Pu'uloa Road, Salt Lake Boulevard and Pukoloa Street today, 8:30 a.m. to 3 p.m., for utility line installation.

    Lane closures along Kamehameha Highway in Waiahole Valley area

    Lanes will be closed along Kamehameha Highway between Waiahole Valley Road and Crouching Lion Inn today for roadwork. One lane of traffic in either direction will be closed and contra-flowed from 8:30 a.m. to 3 p.m.

    Asphalt shortage stalls projects

    The following highway construction projects are on hold because of an asphalt shortage:

  • Kamehameha Highway resurfacing between Waiahole Valley Road and Crouching Lion.

  • Kamehameha Highway resurfacing between Castle Junction and the state veterans cemetery (Kane'ohe).

  • Farrington Highway resurfacing through Waipahu Town. Resurfacing work initially scheduled to begin in June will now most likely begin in July.

  • Road repairs/resurfacing of Kamehameha Highway through 'Aiea/Pearl City and Kalaniana'ole Highway through Waimanalo.