Posted at 2:52 a.m., Monday, June 12, 2006
Lots of O'ahu roadwork planned for today
Advertiser Staff
Summer weather has arrived and with it lots of roadwork. O'ahu drivers are advised to be aware of these projects.
H-1 work planned
Liliha on-ramp to close
Closures on Fort Weaver Road
Pali Highway work scheduled
Lots of work on Farrington
- In the westbound direction near Kahi Mohala from Tuesday through Friday, 8:30 a.m. to 3 p.m., for paving work.
- In the Honolulu-bound direction near Chevron from Wednesday through Friday, 8:30 a.m. to 3 p.m., for concrete barrier and shoulder work.
- In the westbound direction between Kahuali'i Street and Paiwa Street from Tuesday through Friday, 7:30 a.m. to 3 p.m.
Pu'uloa Road work set
Possible lane closures may also occur in both directions along Salt Lake Boulevard between Ala Napunani and Pu'uloa Road from 8:30 a.m. to 3 p.m. Tuesday through Friday for utility line installation.
'Aiea Access Road to close
Shoulder-lane closures may occur along the southeast on-ramp (Honolulu-bound) from Kamehameha Highway to the Moanalua Freeway.
A right single-lane closure is scheduled along the Moanalua Freeway (eastbound) between McGrew Point and the loop ramp Tuesday through Friday, 8:30 a.m. to 3 p.m., as part of the roadwork.
The right lane along Kamehameha Highway in the southbound direction will be closed between McGrew Point and Salt Lake Boulevard Tuesday through Friday, 8:30 a.m. to 3 p.m., for guardrail work.
Kailua Road construction planned
Wilson Tunnel to close nights
Kamehameha Highway roadwork set
Halawa Heights Road closures
Single-lane closures may occur along Halawa Heights Road between Ulune Street and Fernridge Place, near Camp Smith, Tuesday through Friday, 8:30 a.m. to 3 p.m., for pavement marking and sign installation.