Posted at 1:07 a.m., Wednesday, February 7, 2007
Lanes will be closed along H-3
Advertiser Staff
There will be pavement resurfacing work on the H-3 Freeway in both directions between 8:30 a.m. and 3 p.m. at the following locations in Kane'ohe:
Other road projects around O'ahu:
Farrington project continues in Waipahu
Various lanes will be closed in both directions on Farrington Highway from Old Fort Weaver Road to Kamehameha Highway through Friday for pavement striping at these times:
Work continues near Crouching Lion
Lanes will be closed on Kamehameha Highway between Waiahole Valley Road and Crouching Lion Inn in both directions through Friday from 8:30 a.m. through 3 p.m. for sign installation and guardrail work. Traffic will be contra-flowed in the remaining open lane.
Pu'uloa project ongoing
Lanes will be closed in both directions on Pu'uloa Road through Friday near the Salt Lake Boulevard intersection through Friday from 8:30 a.m. to 3 p.m. daily, for traffic signal and utility work.
Nimitz-Ala Moana resurfacing
Lanes will be closed in both directions on Nimitz Highway from Fort Street to Richards Street through Friday morning from 8 p.m. to 5 a.m. nightly, for pavement saw-cutting and trenching for the installation of street lighting and traffic signal conduits.
Bikeway project continues near Pearl Harbor
The right lane will be closed Kamehameha Highway (outbound) between Radford Drive and Halawa Drive through Friday, Feb. 9, from 8:30 a.m. to 3 p.m. for bikeway and sidewalk construction.
H-1 lane to close for tree trimming
The right lane will be closed on the H-1 Freeway between Punchbowl Street and Palama Street for tree trimming and roadside maintenance work at the following locations and times: