honoluluadvertiser.com

Sponsored by:

Comment, blog & share photos

Log in | Become a member
The Honolulu Advertiser

Updated at 9:21 a.m., Thursday, May 31, 2007

New wastewater pipe being connected in Kailua

Advertiser Staff

A newly installed pipe near the Kukanono Wastewater Pump Station in Kailua will be connected by contractors today.

Work is scheduled from 8 a.m. to 3 p.m., when wastewater flow is low. The work involves connection of the new force main (a pressurized pipe that conveys sewage) to the pump station and existing pipes.

Tanker trucks will be standing by as a precaution to handle any increase in wastewater flow that might occur before the connection work is completed.