honoluluadvertiser.com

Sponsored by:

Comment, blog & share photos

Log in | Become a member
The Honolulu Advertiser

Updated at 3:31 p.m., Saturday, November 24, 2007

Roadwork set for H-1 Freeway near airport

Advertiser Staff

Three eastbound lanes on the H-1 Freeway Airport viaduct will be closed nightly starting Monday.

The lane closures start at 6 p.m. and extend through 5 a.m. for concrete repair work.

The work is set to end Friday.

The roadwork is part of a $9.1 million project to repair potholes along a nearly 3-mile stretch of the viaduct between Middle and Valkenburgh streets. Crews will use fast-forming concrete to fill in potholes.

To minimize vibrations while the concrete cures, the speed limit near the work area will be 15 mph.

Motorists are advised to use caution while driving through the work area or use alternate routes.