honoluluadvertiser.com

Sponsored by:

Comment, blog & share photos

Log in | Become a member
The Honolulu Advertiser
Updated at 7:39 a.m., Monday, April 7, 2008

Maui highway lane closures set for this week

Advertiser Staff

The State Department of Transportation has announced the following lane closures for roadwork on Maui this week.

Lane closure schedules may change at any time without further notice.

All projects are weather-permitting.

CABLE INSTALLATIONS (night work)

Single-lane closure on Honoapi'ilani Highway in the Lahaina-bound direction from the Kaheawa Wind Farm (Mile Point 7.5) to the Scenic Lookout (Mile Point 8.6) through Friday morning from 9 p.m. to 5 a.m., nightly, for drilling and trenching work for fiber optic cable installations (contractor permit work).

During these closures, traffic will be contraflowed through the area in the remaining open lane.

PI'ILANI HIGHWAY

CABLE INSTALLATIONS

Single-lane closure on Pi'ilani Highway in the north-bound direction from Kulanihako'i Street to Ohukai Road through Friday, from 8:30 a.m. to 3:30 p.m., for trenching work for fiber optic cable installations (contractor permit work).

HANA HIGHWAY

PAVEMENT MARKINGS

Intermittent lane closures between Dairy Road and Haleakala Highway in both directions through Friday, from 8:30 a.m. to 3:30 p.m. daily, for pavement-marking installations.